Skip to content

Fix build compatibility with IntelliJ Platform 2025.3 #47

Fix build compatibility with IntelliJ Platform 2025.3

Fix build compatibility with IntelliJ Platform 2025.3 #47

Triggered via push December 8, 2025 21:40
Status Failure
Total duration 53m 37s
Artifacts

publish.yaml

on: push
Matrix: test
Matrix: verify
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Run Tests for 251
Process completed with exit code 1.
Verify Plugin for 251
Process completed with exit code 1.
Run Tests for 252
Process completed with exit code 1.
Verify Plugin for 252
The self-hosted runner lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.